Our office is located at the heart of Dublin 8, on lively Francis Street near St Patrick's Church, and only a 5 minute cycle to St. Stephen’s Green.
32 Francis Street, Studio 8
Francis Street Studios, Dublin
Ireland D08 NN96
+353 (0) 15392977
Monday - Friday: 8AM - 6PM
Saturday & Sunday: Closed

Smart, practical, and cost-effective structural and civil engineering solutions. From small-scale alterations to large developments, we bring innovation and modern construction techniques to every project.
Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
Bluebell Modular
Project type
Residential
Client
Modular Express Group
Date
.
Role
Civil, Structutal, Transport and Geotechnical
Location
Bluebell, Dublin 12
Description
The Blue Bell Modular Project presented a unique challenge and opportunity, involving the design coordination of foundations and drainage with the modular superstructure above. Fabricated in Poland, the modular units required our team to travel to the factory at critical points for thorough inspections. Tolerance became a focal point in this modular endeavor, emphasizing the critical importance of precision in this construction method. Close collaboration with Forken Construction and Modular Express ensured a high level of coordination throughout the project. Sustainable Urban Drainage System (SUDS) on the site was achieved through permeable paving, tree pits, and oversized pipes to attenuate flows. A notable sewer extension was undertaken to connect the site seamlessly to the public network.
Design Coordination with Modular Superstructure
Our team played a pivotal role in designing foundations and drainage that seamlessly coordinated with the modular superstructure.
The collaborative effort ensured that all components worked in harmony, reflecting the precision required in modular construction.
International Inspections for Modular Units
The modular units, fabricated in Poland, demanded international inspections by our team at critical phases.
This hands-on approach ensured quality control and adherence to design specifications throughout the manufacturing process.
Tolerance in Modular Construction
Tolerance management became a critical aspect of the project due to the nature of modular construction.
Working closely with Forken Construction and Modular Express, we emphasized precision to meet the stringent requirements of modular building.
International Inspections for Modular Units
The modular units, fabricated in Poland, demanded international inspections by our team at critical phases.
Conclusion
The Blue Bell Modular Project exemplifies our commitment to innovation and precision in engineering. From international inspections to tolerance management in modular construction, our close collaboration with construction partners ensured the successful realization of a complex and technologically advanced project. The implementation of sustainable drainage solutions further underscores our dedication to environmental responsibility and thoughtful engineering practices.

Smart, practical, and cost-effective structural and civil engineering solutions. From small-scale alterations to large developments, we bring innovation and modern construction techniques to every project.
Quick Links
About Us
Projects
Case Studies
Our Team
Careers
Contact
Our Services
-
Structural Engineering
-
Civil Engineering
-
Flood Risk Assessments
-
Inspection and Assessment Reports
-
Hydro-Geological and Geo-Technical
-
Facade Engineering
-
Value Engineering and Feasibility Studies
-
Peer Reviews
-
Modular Construction Consultancy
-
Precast Construction Consultancy
-
Building Information Modelling (BIM stage 2 delivery)
Contact Info
32 Francis Street, Studio 8
Francis Street Studios, Dublin
Ireland D08 NN96