Our office is located at the heart of Dublin 8, on lively Francis Street near St Patrick's Church, and only a 5 minute cycle to St. Stephen’s Green.
32 Francis Street, Studio 8
Francis Street Studios, Dublin
Ireland D08 NN96
+353 (0) 15392977
Monday - Friday: 8AM - 6PM
Saturday & Sunday: Closed

Smart, practical, and cost-effective structural and civil engineering solutions. From small-scale alterations to large developments, we bring innovation and modern construction techniques to every project.
Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
2 Chimney Way
Project type
Residential
Client
Majorfield Ltd
Date
.
Role
Civil, Structutal, Transport and Geotechnical
Location
Rathgar Road, Dublin 6
Description
The 2 Chimney Way Project is characterized by a concrete frame structure situated in close proximity to sensitive neighbors. A comprehensive site investigation was meticulously scoped, leading to the efficient use of shallow pad foundations. The project demanded careful detailing to ensure that any interface with the boundary wall would not adversely impact neighboring properties. Integrating Sustainable Urban Drainage System (SUDS) measures onto the tight site posed a challenge, while maintaining connections with the public network. The front of the site falls under the classification of "taken in charge," and this aspect was meticulously detailed in accordance with specific specifications for public-side works outlined by Irish Water. Our close collaboration with the main contractor, BKRN, extended to the completion of temporary works on the scheme, ensuring efficiency and seamless integration with permanent works where possible.
Efficient Shallow Pad Foundations
A detailed site investigation led to the implementation of highly efficient shallow pad foundations, optimizing the structural support while minimizing excavation.
Neighbor-Friendly Design
Careful detailing was undertaken to ensure that any interface with the boundary wall had no negative impact on neighboring properties.
This approach reflects a commitment to minimizing disruptions to the surrounding community.
Challenges in SUDS Integration
Integrating Sustainable Urban Drainage System (SUDS) measures onto the compact site presented challenges.
The engineering solutions were carefully designed to manage surface water effectively while navigating the constraints of the tight space.
Compliance with "Taken in Charge" Regulations
The front of the site falls under the classification of "taken in charge," requiring specific adherence to Irish Water's specifications for public-side works.
Detailed compliance ensures the seamless integration of the project with public infrastructure.
Collaboration with BKRN
Close collaboration with the main contractor, BKRN, extended to the completion of temporary works on the scheme.
This collaborative effort aimed at ensuring efficiency and integration of temporary and permanent works.
Conclusion
The 2 Chimney Way Project showcases our ability to navigate complex challenges inherent in close-quarter construction. From efficient foundation design to neighbor-friendly detailing and compliance with regulatory specifications, the project reflects our commitment to engineering excellence and harmonious integration with the local environment. Close collaboration with BKRN underscores our dedication to a seamless construction process, from temporary works to the finalization of the permanent structure.

Smart, practical, and cost-effective structural and civil engineering solutions. From small-scale alterations to large developments, we bring innovation and modern construction techniques to every project.
Quick Links
About Us
Projects
Case Studies
Our Team
Careers
Contact
Our Services
-
Structural Engineering
-
Civil Engineering
-
Flood Risk Assessments
-
Inspection and Assessment Reports
-
Hydro-Geological and Geo-Technical
-
Facade Engineering
-
Value Engineering and Feasibility Studies
-
Peer Reviews
-
Modular Construction Consultancy
-
Precast Construction Consultancy
-
Building Information Modelling (BIM stage 2 delivery)
Contact Info
32 Francis Street, Studio 8
Francis Street Studios, Dublin
Ireland D08 NN96